Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 10 PSI TEST EXISTING UNDERGROUND TO NEW UNDERGROUND UP AT BUILDING TO STOVE, WATER HEATER & FURNACE OK |
|
| 08/17/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. GAS PIPING TO BE CONFIGURED TO PROVIDE WATER HEATER PULL SPACE. 2. PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING. 3. VENT FOR WATER HEATER & FURNACE TO BE INSTALLED CORRECTLY WATER HEATER TO ENTER ABOVE FURNACE. VENT CONNECTIONS SHALL HAVE 3-GALV SCREWS AT EACH JOINT, VENT TO TERMINATE MINIMUM 2' ABOVE TOP OF COOLER WITH APPROVED VENT CAP (DOUBLE WALL). 4. PROVIDE BONDING OF BUILDING GAS PIPING. 5. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL BE FULL SIZE RIDGID PIPING GRAVITY DRAIN TO DAYLIGHT. 6. SEDIMENT TRAPS SHALL BE INSTALLED AT APPLIANCES GAS ENTRY. 7. PROVIDE AGA OR CSA APPROVED GAS VALVE AT STOVE #4 |