Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 08/10/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* - YOU HAVE UNWRAPPED TOOL MARKS BELOW GRADE - PRIMER AND WRAP ALL TOOL MARKS - PRIMER IS TO BE APPLIED BEFORE THE 10 MIL. TAPE - PROVIDE ELECTRICAL BONDING - WATER HEATER SHALL REST ON A 3" CONCRETE PAD AND SHALL BE INSTALLED PRIOR TO GAS UTILITY CLEARANCE. - PROVIDE (ADD) PERMIT FOR WATER HEATER REPLACEMENT, - ALSO, IT APPEARS THAT THIS HEATER IS BEING RELOCATED, ALL PIPING SHALL BE INSPECTED. - ALSO, PROVIDE PERMIT OR PROOF INSPECTION FOR NEW GAS FURNACE. - NOTE VALVE IS IN THE ON POSITION AT FURNACE. |