Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/04/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - ALL TUBE SHALL BE REAMED TO THE FULL ID OF THE TUBE - A DEBURRING TOOL IS NECESSARY TO ACCOMPLISH THIS. - A FITTING BRUSH IS TO BE USED TO CLEAN THE FITTINGS BUT WILL NOT WORK AS A DEBURRING TOOL. - PROPER INSTALLATION OF COPPER TUBING IS CRITICAL TO PREVENT PREMATURE FAILURE OF THIS PIPING SYSTEM. - REAM ALL JOINTS BEFORE RECALLING FOR INSPECTION. |
|
| 08/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COPPER TUBE INSTALLATIONS SHALL BE INSTALLED PER UPC INSTALLATION STANDARDS. SEE 15 3 COMPLY W/ALL SECTIONS OF THIS CHAPTER 316.1.2.3 REQUIRES THAT ALL TUBE BE REAMED TO THE FULL ID OF TUB SEE ALSO SEC 310.3 REQUIRES THAT EXCESS FLUX BE REMOVED 316.1.2.9 316.1.2.6 ASSEMBLY AND SUPPORT |