Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T06PL01340
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/02/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* YOU ARE REQUIRED TO PROVIDE AN 1. AIR PRESSURE TEST ON GAS PIPING SYSTEM USE A #15 GAUGE WITH 1/10 PSI INCREMENTATION. 2. AGA VALVES ARE REQUIRED AT GAS APPLIANCES 3. GAS PIPING ON ROOF IS NOT SUPPORTED, SUPPORT PIPING W/WEATHER RESISTANT PIPE SUPPORTS. 4. WH FLUE VENT TERMINATION IS AGAINST FURNACE. EXTEND FLUE VENT TO ONE FOOT ABOVE SIDE WALL OF FURNACE/AC UNIT. USE TYPE B VENT. NOTE: WH APPEARS TO BE ORIGINAL, T&P TERMINATION WILL BE ADDRESSED WHEN WH IS REPLACED. |
|
| 08/01/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CALLED KELLY AT 10:30 NO ANSWER AT DOOR 1045-1057 NO TEST GAUGE AT METER PRESSURE TEST REQUIRED |