Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/01/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. FINISH PIPING TO WATER HEATER AND SUPPLY SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER & FURNACE 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DEVICE TO BE FUNCTIONAL AND BE FULL SIZE RIGID DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN. 3. FURNACE VENT TO TERMINATE MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING (FULL SIZE) AND CAP. RETEST SYSTEM AND CALL BACK IN. |