Permit: T06PL01083

Parcel: 10711166B


Addresses:

3038 N BALBOA AV

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
08/23/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
08/14/2006 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1. EXCEPT FOR SINGLE PIECE MANUFACTURED RISERS, PLASTIC GAS PIPE SHALL HAVE AT LEAST 30" OF HORIZONTAL HARD PIPE BEFORE VERTICAL RISER.
2. GAS PIPE TO BE AT LEAST 3 1/2" ABOVE GRADE MAY NOT LAY ON CONCRETE
3. PROVIDE BOND
07/11/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. OK TO COVER UNDERGROUND
NEED TO SEE THE REST OF THE PIPING AND MAKE ALL CONNECTIONS.
07/10/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
06/29/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PLASTIC GAS PIPE SHALL HAVE 18" OF COVER AT ALL POINTS
2) RISERS SHALL RISE VERTICALLY
3) HOW IS THE CONNECTION TO BE MADE AT THE HOUSE
4) IT IS NOT ADVISABLE TO TEST AT THE UPPER LIMITS OF THE GAGE