Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/29/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WATER HEATER TEMPERATURE AND PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT. TERMINATE AT 90 DEGREE DOWN WITH APPROVED RIDGID PIPING 2) PROVIDE AGA OR CSA APPROVED GAS VALVES AT APPLIANCES 3) PROVIDE BONDING OF BLDG GAS PIPING 4) PRIME AND TAPE ALL TOOL MARKS ON UNDERGROUND PIPING 5) PROVIDE FIRM BED FOR PIPING TO ? ON IN DITCH |