Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/22/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTE #3 LOOK AT SOUTHSIDE OF BUILDING BY TRASH CAN |
|
| 06/21/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SECURE ANGLE STOPS AT KITCHEN SINK. 2. PROVIDE 18" OF MINIMUM COPPER PIPING AT WATER HEATER IN WALL FOR FUTURE SOLDER CONNECTIONS. 3. PROVIDE VACUUM BREAKERS AT ALL HOSE BIBBS. 4. PROVIDE SEPARATIONN OF HOT & COLD PIPING. |