Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
Permit Number - T06PL01002
Inspection Description - PLUMBING - GAS PRESS TEST FNL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2006 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
06/19/2006 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - ALL BELOW GROUND PIPING SHALL HAVE A FACTORY APPLIED COATING. - FIELD WRAP TOOL MARKS AND FITTINGS. USE PIPEWRAP PRIMER BEFORE WRAPPING W/10 MIL. TAPE. - PROVIDE PRESSURE TEST ON PIPING W/AIR. USE A GAUGE WITH 1/10 PSI INCREMENTATIONS. - SECURE WH VENT CONNECTOR W/GALV SHEET METAL SCREWS. - EXTEND WH AND FURNACE VENT TO TWO FEET ABOVE SWAMP COOLER. - USE DOUBLE WALL TYPE B VENT. - T&P RELIEF DRAIN ON WH SHALL BE OPERATING AND SHALL GRAVITY DRAIN TO EXTERIOR AND TERMINATE ABOVE GROUND WITHOUT THREADS. - NOTE: WH DRAIN HAS A DRIP. - PROVIDE ELECTRICAL BONDING OF GAS PIPING. |