Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/03/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE BONDING OF BUILPIPING GAS PIPING AS REQUESTED ON PAST INSPECTIONS GAS CARD AT MOTOR 889-1888 |
|
| 06/28/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE ITEMS #2, 3, 4, 5, 6 & 8 FROM 6/23/06 2) PROVIDE NIPPLE THRU APPLIANCE HOUSING AT WEST FURNACE 3) CAP OLD GAS PIPING |
|
| 06/23/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PIPING SYSTEM CANNOT HAVE APPLIANCE FLEX EXCEPT AT APPLIANCES. PROVIDE RIGID PIPE. 2. PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENTS FROM APPLIANCES AND REMOVE TAPE AT SINGLE TO DOUBLE WALL CONNECTION OF FURNACE. 3. WATER HEATER REQUIRES TEMPERATURE & PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPEAL FORM SIGNED BY CITY FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF ON SITE WITH CORRECT INSTALLATION. 4. SINGLE WALL VENT REQUIRES 6" MINIMUM CLEARANCE FROM COMBUSTIBLES DOUBLE WALL VENT REQUIRES 1" MINIMUM CLEARANCE FROM COMBUSTIBLES. 5. PROVIDE SEDIMENT TRAPS AT GAS INLET FOR WATER HEATER & FURNACES. 6. PROVIDE BONDING OF BUILDING GAS PIPING. 7. SECURE ALL INTERIOR GAS PIPING. 8. VENT FROM WEST FURNACE TO BE 2' ABOVE TOP OF COMBUSTION AIR INTAKE WITH DOUBLE WALL VENT PIPE INSTALLED CORRECTLY WITH APPROVED VENT CAP WHEN WITHIN 10' OF INTAKE. 9. PROVIDE FIRM BEDDING FOR EXTERIOR GAS PIPING. |