Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T06PL00995
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/22/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
06/20/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. VERTICAL PIPE AT METER TO BE SUPPORTED. 2. ALL ROOF TOP GAS TO BE SUPPORTED. 3. PIPING PASSING THROUGH THE ROOF TO HAVE APPROVAL FLASHING. 4. PROVIDE ACCESS TO ROOF. 5. WHEN TESTING WITH LESS THAN TEN POUNDS, A GAUGE MEASURING NO MORE THAN FIFTEEN POUNDS IN 1/10 POUND INCREMENTATION IS REQUIRED -- YOUR GAUGE REQUIRES A MINIMUM TEN POUND TEST. |
|
06/16/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 15 PSI TEST IS OK SECURE GAS PIPE @ WATER HEATER. PROVIDE MIN. 3 SCREWS IN ALL JOINTS OF VENT CONNECTORS PROVIDE ELECTRICAL BOND TO GAS PIPING PROVIDE HIGH & LOW COMBUSTION AIR VENTS TO BOTH WATER HEATER ROOMS. PROVIDE A NEW T&P RELIEF VALVE ON OLD WATER HEATER. REPLACE BROKEN ELBOW AT END OF T&P DRAIN. BE SURE ALL ACTIVITIES ON THIS PERMIT ARE CALLED IN FOR INSPECTION. |