12/20/2007 | SITE - SEWER | Approved | IVRS - Inspection :* | |
07/16/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* THIS INSPECTION FOR PHASE 3 AIR TESTING FOR MANHOLE #29 TO CLEANOUT #2 LOTS #765-770 OK MANHOLE #28 TO CLEANOUT #6 LOTS #801-806 PHASE 3 AIR TESTING COMPLETE NEED OK FROM PIMA COUNTY & PCDEQ AUTHORIZATION TO DISCHARGE DOWNSTREAM FOR FINAL PHASE 3 |
|
06/27/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #1 TO CLEANOUT #16 LOTS 516-521 AIR TEST OK FROM MANHOLE #1 TO CLEANOUT #13 LOTS 512-515 AIR TEST OK FROM MANHOLE #2 TO CLEANOUT #20 LOTS 522-527 AIR TEST OK FROM MANHOLE #2 TO CLEANOUT #17 LOTS 508-511 AIR TEST OK FROM MANHOLE #3 TO CLEANOUT #24 LOTS 528-533 AIR TEST OK FROM MANHOLE #3 TO CLEANOUT #21 LOTS 506-509 AIR TEST OK 1. NEED OK FROM PIMA COUNTY & PCDEQ AUTHORIZATION TO DISCHARGE DOWNSTREAM FOR FINAL |
|
04/02/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR 35 SEWERS WITH 4" HCS LATERALS FOR LADYSCIPPER LANE & TIGERLILY LANE FROM PUBLIC MANHOLES BEDDING, LAYING, TRACER OK TO SHADE & BACKFILL WILL TEST AT LATER DATE. |
|
03/26/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) FROM MANHOLE #6 TO CLEANOUT #12 & #9 PIPING TRACER WIRE AND BEDDING OK 2) FROM MANHOLE #5 TO CLEANOUT #8 & #5 PIPING TRACER WIRE AND BEDDING OK 3) FROM MANHOLE #4 TO CLEANOUT #4 & #1 PIPING TRACER WIRE AND BEDDING OK 4) FROM MANHOLE #3 TO CLEANOUT #12 & #24 PIPING TRACER WIRE AND BEDDING OK 5) VACUUM TEST TO BE DONE AT LATER DATE |
|
03/13/2007 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* ADD 03045 SITE SEWER PRE-CONSTRUCTION MEETING WITH LEO, BORDERLAND INSTALLATION SHALL REQUIRE DIRECTIONAL DRAINAGE FITTINGS, TRACER WIRE PER STATE STATUE 2256, BEDDING, SHADING WITH VISUAL INSPECTION PRIOR TO BACKFILL AIR TESTING AT LATER DATE FOR PIPING WITH VERIFICATION OF GRADE BY ENGINEERING FIRM OR SURVEYOR. |