Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* OK FOR GAS 889-1888 SW GAS T&P DRAIN DRIPPING |
|
| 06/02/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. VENTS FROM WATER HEATER & FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT & CAP. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL GRAVITY DRAIN TO DAYLIGHT AND TERMINATE 6" TO 24" FROM FINISH GRADE AT 90 DEGREES DOWN. 3. PROVIDE BONDING OF BUILDING GAS PIPING. |