Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/12/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 14 PSI TEST FROM METER NEW PIPING. UNDERGROUND + OVERHEAD TO ROOFTOP UNIT, WATER HEATER & STOVE OK |
|
| 06/09/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 06/05/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* GAS PIPING UNDERGROUND FROM METER TO STUB UP AT BUILDING 14 PSI TEST OK. OK TO COVER TO POINTS USED ABOVE. COMPLETION OF BOTH SYSTEMS. TIE-INS AT ALL ENDS WITH TESTING REQUIRED AT FUTURE INSPECTION. |