Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/01/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 14 PSI TEST NEW PIPING FROM METER UNDERGROUND UP AT BUILDING TO DRYER, EXISTING TO WATER HEATER/FURNACE OK. 1. PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENTS FROM WATER HEATER/FURNACE. REMOVE TAPE FROM SINGLE TO DOUBLE WALL VENT CONNECTION. 2. PROVIDE PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF ON SITE WITH CORRECT INSTALLATION. 3. PROVIDE BONDING OF BUILDING GAS PIPING. |