Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2006 | PLUMBING - FINAL | Approved | ||
| 06/06/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - PROVIDE A PRESSURE TEST, GAUGE SHALL HAVE 1/10 PSI INCREMENTATION. - INSTALL A GAS SHUT OFF VALVE TO WH - INSTALL A NEW FLEX AT WH - TERMINATE WH T&P OUTSIDE 6" TO 24" ABOVE GRADE SUPPORT GAS PIPING AT WH & FURNACE SECURE WH VENT CONNECTOR. - PROVIDE ELECTRICAL BONDING (GROUND WIRE). - INSTALL AGA VALVE AT STOVE. - PROVIDE SEDIMENT TRAP AT FURNACE/WH LOCATION. - GAS PIPE PRIMER - PRIME ALL FITTINGS & TOOL MARKS BEFORE WRAPPING W/10 MIL. - USE APPROVED PIPING FOR HW (CPVC, COPPER, GALV) |