Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL00884

Parcel: 120050500


Addresses:

4500 S 17TH AV

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
06/13/2006 PLUMBING - FINAL Approved
06/06/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
- PROVIDE A PRESSURE TEST, GAUGE SHALL HAVE 1/10 PSI INCREMENTATION.
- INSTALL A GAS SHUT OFF VALVE TO WH
- INSTALL A NEW FLEX AT WH
- TERMINATE WH T&P OUTSIDE 6" TO 24" ABOVE GRADE SUPPORT GAS PIPING AT WH & FURNACE
SECURE WH VENT CONNECTOR.
- PROVIDE ELECTRICAL BONDING (GROUND WIRE).
- INSTALL AGA VALVE AT STOVE.
- PROVIDE SEDIMENT TRAP AT FURNACE/WH LOCATION.
- GAS PIPE PRIMER - PRIME ALL FITTINGS & TOOL MARKS BEFORE WRAPPING W/10 MIL.
- USE APPROVED PIPING FOR HW (CPVC, COPPER, GALV)