Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/14/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO ANSWER AT DOOR 4PM I WILL COME BY MONDAY HAVE BOTH PERMIT CARDS AVAILABLE DON'T FORGET THE 1" CLEARANCE REQUIRED BETWEEN B-VENT AND WOOD AT ROOF PENETRATION |
|
| 11/03/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROPERLY SOLVENT CEMENT CPVC AND SUPPORT EVERY 36" TERMINATE W/OUT TRAP AND AS PREVIOUSLY NOTED PROVIDE A FULL SIZED VALVE AT WATER SUPPLY 5" TYPE B VENT REQUIRED THRU ROOF AND TO TERMINATION POINT 3' ABOVE COOLER, SECURE EACH CONN. OF VENT CONNECTOR W/3 SCREWS |
|
| 09/12/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - T&P SHALL GRAVITY DRAIN TO EXTERIOR AND TERMINATE 6"-24" ABOVE GROUND WITHOUT THREADS. USE CPVC, GALVANIZED OR COPPER RIGID TUBING. - REMOVE BLACK IRON 90 ON HW - PROVIDE SEDIMENT TRAP AT GAS CONNECTION - CORRECT VENTING, USE GALVANIZED VENT PIPE, SECURE WITH GALVANIZED SHEET METAL SCREWS. |