Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* POST ADDRESS PIPING REPLACED WITHIN BUILDING REQUIRES A PLAN & PERMIT. SEWER LINE APPROVED - ONLY |
|
| 05/16/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* WATER TEST FROM EXISTING CLAY BACK UP STREAM THRU INCLINE CLEANOUT END OF LINE CLEANOUT AND STUBBED UP AT NORTHWEST CORNER OF EXISTING BUILDING. 1. NEED TO SEE CONNECTION TO EXISTING BUILDING AND TEST WYE AT CURB BROUGHT UP TO GRADE AS CLEANOUT WITH TRACER WIRE INSIDE CAST IRON CLEANOUT COVER CONCRETED IN PLACE. |