Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT PIPING FROM WATER HEATER/FURNACE VENT. 2. WATER HEATER T&P DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT. WITH 90 DEGREE DOWN AT TERMINATION. 3. PROVIDE BONDING OF BUILDING GAS PIPING |