Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 11 PSI TEST NEW PIPING UNDERGROUND UP AT BUILDING ABOVE GRADE TO EXISTING THRU TO WATER HEATER, FURNACE, DRYER OK GAS CARD AT METER. |
|
| 05/23/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 10:55 NO MESSAGE # NO ACCESS PLEASE HAVE AN ADULT PRESENT AT REINSPECTION. |
|
| 05/18/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. TEST GAS PIPING IN ITS ENTIRETY. 2. SECURE & SUPPORT GAS PIPING AT BUILDING EXTERIOR. 3. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. 4. PROVIDE CORRECT VENT CONNECTION FOR WATER HEATER DRAFT HOOD TO DOUBLE WALL VENT. 5. VENT FROM WATER HEATER & FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE FOR WATER HEATER 2' ABOVE FOR FURNACE TOP OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING & CAP. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPING. 6. PROVIDE BONDING OF BUILDING GAS PIPING. |
|
| 05/16/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLEASE SCHEDULE AN INSPECTION WHEN AN ADULT WILL BE PRESENT. |