Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PETITION OF APPEAL #2006-066 ON SITE 1. PROVIDE CONNECT 125# PRESSURE RELIEF AT EXTERIOR AND T&P DRAIN PIPE TO HAVE 1" ABOVE TOP OF PAN FOR WATER HEATER. 2. VENT FROM WATER HEATER/FURNACE TO BE 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. 3. GAS PIPING IN WATER HEATER/FURNACE CLOSET TO BE SECURED CORRECTLY. 4. PROVIDE VACUUM BREAKER AT NEW HOSE BIBB AT 125# PRESSURE RELIEF SITE. |