Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2006 | PLUMBING - FINAL | Approved | ||
| 05/03/2006 | PLUMBING - FINAL | Not ready for Inspection | 1. PROVIDE BONDING OF BUILDING GAS PIPING. 2. PROVIDE FULL SIZE 3/4" RIGID DRAIN TO DAYLIGHT FOR WATER HEATER TEMPERATURE & PRESSURE RELIEF DEVICE. THIS PIPING SHALL GRAVITY DRAIN TO DAYLIGHT & TERMINATE 90 DEGREE DOWN OR EXTERIOR 6" TO 24" FROM FINISH GRADE. 4. PROVIDE CORRECT SINGLE WALL VENT CONNECTOR BETWEEN WATER HEATER DRAFT HOOD AND ADJ. 90 DEGREE FITTING WITH 3-GALV SCREWS AT EACH JOINT OF VENT PIPING. 5. REMOVE TEMPORARY WEATHER COVER ON VENT TERMINATION AROUND VENT CAP. 6. RETEST SYSTEM. |