Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/27/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* VENT FROM FURNACE TO BE EXTENDED TO 2' ABOVE TOP OF COMBUSTION AIR INTAKE WITH DOUBLE WALL VENT MATERIAL WITH APPROVED DOUBLE WALL VENT CAP. |
|
| 04/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE MINIMUM AIR TEST ON ENTIRE GAS SYSTEM. 2. PROVIDE ACCESS TO ENTIRE GAS SYSTEM. 3. PROVIDE COMBUSTION AIR FOR WATER HEATER. 4. UNION SHALL NOT BE BURIED UNDERGROUND. 5. PROVIDE BONDING OF BUILDING GAS PIPING. THIS IS NOT A COMPLETE LIST. |