Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/27/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 17 PSI ON 30 PSI GAUGE THE PERMIT#T04CM03224 IN WHICH THE MECHANICAL INSPECTION WAS APPROVED IS FOR AN ARIZONA ROOM ADDITION. I DO NOT BELIEVE THAT THE RELOCATION OF THE FURNACE WAS PART OF THAT INSPECTION BASED ON MY INSPECTION ON 4/25/06. PLEASE OBTAIN A PERMIT SPECIFICALLY FOR THE RELOCATION AND REPLACEMENT OF THE FURNACE. PLEASE CALL FOR A MECHANICAL INSPECTION AFTER OBTAINING PERMIT AND BEFORE RECALLING FOR GAS RECONNECT. |
|
| 04/25/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 04/21/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 2:00 P.M. NO ANSWER AT DOOR. NO GAUGE ON GAS PIPING. PRESSURE TEST REQUIRED. ACCESS TO ALL GAS APPLIANCES REQUIRED. |