Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/24/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MAKE UP VENT CORRECTLY AT DRAFT HOOD. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION DRAFT SPACE & PROVIDE 1/4" PER FOOT RISE ON VENT PIPING. 2. PROVIDE SEDIMENT TRAP AT GAS ENTRY FOR WATER HEATER & NEW SUPPLY FLEX PER WARNING LABEL PER MANUFACTURER. 3. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPING. |