Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* OK FOR GAS BACKFILL W/CLEAN DIRT |
|
| 06/07/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/22/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO ACCESS 9:48 IF NOT ADULT IS PRESENT TO PROVIDE ACCESS ON DAY OF REINSPECTION EXPECT TO PAY REFEE |
|
| 05/19/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* INSTALL TRANSITION RISOR AT METER, CAP IT. PRESSURE TEST ENTIRE SYSTEM. SUPPORT PIPING AT FURNACE & WH SECURE WH VENT PIPING W/SHEET METAL SCREWS RECALL FOR INSPECTION, REQUEST AM |
|
| 05/10/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO ONE HOME FOR INSPECTION. 1:03-1:08 PM |
|
| 05/09/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTE ABOVE 1:14 PM NO ACCESS |
|
| 04/27/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOTE: MINIMUM 18" OF COVER IS REQUIRED ON PLASTIC GAS PIPING. 1. PROVIDE TRANSITION RISER AT METER LOCATION. 2. EXPOSE PIPING AT LOCATIONS WHERE SHEETROCK WAS CUT OUT. 3. PROVIDE MINIMUM TEST ON ENTIRE SYSTEM. IT SHALL NOT LOSE ANY PRESSURE FOR DURATION OF TEST PERIOD. 4. PIPING IN WATER HEATER/FURNACE CLOSET SHALL BE INSTALLED TO PROVIDE REMOVAL SPACE FOR WATER HEATER. 5. PROVIDE 5-GALV SCREWS AT EACH JOINT OF WATER HEATER/FURNACE FLUE VENT PIPING. MAKE CORRECTIONS AND RETEST SYSTEM. |
|
| 04/26/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/21/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS AT TIME OF REINSPECTION 9:19 AM |