Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1. THIS IS A GAS REPIPE. 2. PIPING OK PRESSURE TEST OK VALVES AND FLEXES OK CONTRACTOR TO SUPPORT PIPE AS NEEDED. 3. OWNER PLEASE NOTE: WHEN THE SPACE HEATER WAS REMOVED FROM THE BACK ROOM, THE VENT SHOULD HAVE BEEN REMOVED ALSO, AND THE ROOF PATCHED AS REQUIRED BY THE MECHANICAL CODE. PLEASE HAVE YOUR PLUMBER DO THIS OR YOU CAN. GAS CARD LEFT AT METER. |