Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 07/31/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/27/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. ABS DWV INTERIOR OK TO COVER 2. NEED TO SEE ALL OUTSIDE PIPING INTERCEPTOR SET IN PLACE. |
|
| 07/26/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. NOT INSTALLED PER PLAN NO REDLINES ON SITE EACH FIXTURE TRAP REQUIRES A VENT 2. WATER TEST OK NEED TO SEE CONNECTIONS TO EXISTING PIPING |