Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/13/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PEX WATER PIPING IS OK, BACKFILL WITH CLEAN FILL 3/4" MNVS COPPER PIPING AT SERVICE IS REQUIRED TO BE TYPE L BACKFLOW INSTALLATION REQUIRES A PERMIT FROM TUCSON WATER AND A CERTIFICATION TEST. BACKFLOW INSTALLATION ALSO REQUIRES A UNION AT ASSEMBLY THAT WILL ALLOW REMOVAL OF ASSEMBLY. RELIEF VALVE SHALL POINT DOWN AND HAVE 12" OF CLEARANCE. |