Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/14/2006 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 04/12/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PLASTIC GAS PIPING UNDERGROUND REQUIRES MINIMUM 18" OF COVER. 2. WATER HEATER/FURNACE AREA ON EAST END REQUIRES MINIMUM COMBUSTION AIR OPENING FOR 34,000 BTU DEVICE FROM OUTSIDE OF STRUCTURE. 3. PROVIDE LENNOX PULSE INSTALLATION INSTRUCTION BOOKLET FOR DIRECT VENT APPLIANCE. VENT FROM FURNACE DOES NOT APPEAR TO BE INSTALLED CORRECTLY. 2 INCH TO 3" BACK TO 2" DOES NOT APPEAR TO BE CORRECT VENT. 4. PROVIDE AGA OR CSA APPROVED GAS VALVES FOR ALL APPLIANCES. 5. THIS IS A GAS REPIPE ENTIRE GAS SYSTEM TO BE TESTED ENTIRELY. 6. PROVIDE BONDING OF BUILDING GAS PIPING. 7. VENT FROM WEST WATER HEATER REQUIRES 1" MINIMUM CLEARANCE FROM COMBUSTABLES AT ROOF THIS WATER HEATER REQUIRES GRAVITY DRAIN TO DAYLIGHT RIDGID APPROVED PIPING TO T&P DRAIN. 8. WEST WATER HEATER IS REQUIRED TO BE 18" ABOVE FLOOR LEVEL IN GARAGE FOR POINT FO SOURCE OF IGNITION INSTALLATION INSTRUCTIONS FOR FURNACE ON SITE. |