Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* TEMPERATURE & PRESSURE RELIEF IS INSTALLED CORRECTLY FOR ELECTRIC WATER HEATER. PIPE TO BE SEALED AT BUILDING EXTERIOR. CHAPTER #3 & 9 OF IRC CODE IS IN VIOLATION FOR VENT FROM OLD WATER HEATER HAS CAPABILITY TO ALLOW RAIN BACK INTO BUILDING STRUCTURE. NATIONAL ELECTRIC CODE IS IN VIOLATION FOR IMPROPER WIRING TO THIS ELECTRIC WATER HEATER. |