Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/04/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 3. PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER FLUE VENT PIPING. AND FURNACE FLUE VENT PIPING. 4. PROVIDE BONDING OF BUILDING GAS PIPING. 5. FURNACE VENT SHALL BE 2' ABOVE TOP OF ANY AIR INTAKE AND 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE WITH APPROVED DOUBLE WALL VENT MATERIAL. |