Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL00538

Parcel: 130055760


Addresses:

2502 S FORGEUS SV

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
07/07/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
04/11/2006 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
GAS ROUGH PIPING PRESSURE TEST IS OK
GAS PIPING REQUIRES A FINAL PRESSURE TEST WHICH IS TO BE PERFORMED AFTER CONCEALING WORK.
DO NOT STUCCO OVER PIPING ON EXTERIOR WALL, PIPING CANNOT BE ENCASED IN CONCRETE.
WATER PIPING, WASTE AND VENT PIPING IS NEW AND REQUIRES A PERMIT & INSPECTION.
ADD PLUMBING ROUGH & INTERMEDIATE TO PERMIT AND PLAN. CALL FOR INSPECTION.
YOU HAVE PEX TOUCHING METAL AND YOU HAVE SOME DRAINAGE FITTINGS THAT ARE NOT PROPERLY INSTALLED.
04/04/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE TEST GAUGE IN 1/10TH POUND INCREMENTS.
2. PROVIDE BONDING OF BUILDING GAS PIPING.
3. SUPPORT OVERHEAD GAS PIPING AT CHANGES OF DIRECTION AND AT CORRECT INTERVALS.
4. PROVIDE PERMIT FOR NEW FURNACE AND IT SHALL BE INSTALLED FOR GAS CLEARANCE CARD.
NOTE: PROVIDE PERMITS FOR WORK TO BUILDING INTERIOR & EXTERIOR
NOT A COMPLETE LIST.