| 07/07/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/11/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* GAS ROUGH PIPING PRESSURE TEST IS OK GAS PIPING REQUIRES A FINAL PRESSURE TEST WHICH IS TO BE PERFORMED AFTER CONCEALING WORK. DO NOT STUCCO OVER PIPING ON EXTERIOR WALL, PIPING CANNOT BE ENCASED IN CONCRETE. WATER PIPING, WASTE AND VENT PIPING IS NEW AND REQUIRES A PERMIT & INSPECTION. ADD PLUMBING ROUGH & INTERMEDIATE TO PERMIT AND PLAN. CALL FOR INSPECTION. YOU HAVE PEX TOUCHING METAL AND YOU HAVE SOME DRAINAGE FITTINGS THAT ARE NOT PROPERLY INSTALLED. |
|
| 04/04/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE TEST GAUGE IN 1/10TH POUND INCREMENTS. 2. PROVIDE BONDING OF BUILDING GAS PIPING. 3. SUPPORT OVERHEAD GAS PIPING AT CHANGES OF DIRECTION AND AT CORRECT INTERVALS. 4. PROVIDE PERMIT FOR NEW FURNACE AND IT SHALL BE INSTALLED FOR GAS CLEARANCE CARD. NOTE: PROVIDE PERMITS FOR WORK TO BUILDING INTERIOR & EXTERIOR NOT A COMPLETE LIST. |