Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* REVISED APPROVED GAS PLAN ON SITE. THIS INSPECTION FOR GAS PIPING ONLY. INSTALLER SHALL REMOVE ALL DEBRIS & ROCK AND BACKFILL WITH CLEAN MATERIAL. |
|
| 04/12/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REMOVE FUTURE TEE AT BUILDING SERVICE ENTRANCE OR REVISE APPROVED PLAN TO SHOW THIS. 2. PROVIDE SCOTCH COATED PIPE AT RISER FROM TRANSITIN RISER TO 6" ABOVE GRADE THEN PRIME & TAPE FITTINGS & TOOL MARKS. 3. VENTS FROM WATER HEATER & FURNACE TO BE 3' FOR WATER HEATER 2' FOR FURNACE ABOVE TOP OF INTAKES FOR COOLER & COMBUSTION AIR WHEN WITHIN 10' OF INTAKES WITH APPROVED DOUBLE WALL VENT PIPING. 4. PROVIDE BONDING OF BUILDING GAS PIPING. 5. SUPPORT HORIZONTAL PIPING ON BUILDING EXTERIOR. |