Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 12 PSI TEST FROM METER UNDERGROUND UP AT BUILDING OVERHEAD PER APPROVED PLAN. GAS CARD AT METER. |
|
| 04/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/07/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 10 PSI TEST FROM METER TO WATER HEATER, (2) WALL HEATERS AND 3/4" DROP TO ? TOTAL DEMAND IS UNKNOWN. NEED CITY APPROVED GAS ISOMETRIC OF GAS SYSTEM AS REQUESTED ON 3/27/06. SEE ITEMS #4 PROVIDE CLEAN AREA AT BONDING SITE. #6 ALL ITEMS TO BE ADDRESSED. GAS PIPING CANNOT BE DIRECTLY EMBEDDED IN CONCRETE. PLEASE HAVE RETEST AT TIME OF INSPECTION. |
|
| 03/27/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE MINIMUM TEST ON GAS SYSTEM AND PROVIDE TEST GAUGE IN 1/10 POUND INCREMENTS. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL BE FULL SIZE APPROVED PIPING GRAVITY DRAIN TO DAYLIGHT. 3. ALL APPLIANCES TO HAVE APPROVED CSA OR AGA GAS SHUT OFF VALVES. 4. PROVIDE BONDING OF BUILDING GAS PIPING. 5. WATER HEATER ENCLOSURE SHALL REQUIRE MINIMUM 100 SQ. INCHES UPPER & LOWER COMBUSTION AIR. 6. WATER HEATER FLUE VENT REQUIRES 3-GALV SCREWS AT EACH JOINT. DOUBLE WALL VENT THRU ROOF WITH APPROVED VENT CAP - MINIMUM 1" CLEARANCE FROM COMBUSTIBLES. 7. PROVIDE CITY APPROVED GAS ISOMETRIC OF SYSTEM WHEN ADDING GAS FIXTURES. |