Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/12/2006 | PLUMBING - FINAL | Denied | CLAMP PIPING TO BLOCKS ON ROOF, REDWOOD INSTALL SEDIMENT TRAPS AT WH AND FURNACES PER CODE FLEX AT 120,000 BTU FURNACE |
|
| 09/08/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 13 PSI TEST IS NOT HOLDING PRESSURE PROVIDE CLAMPS ON GAS LINE ON ROOF. USE REDWOOD BLOCKS. |
|
| 09/07/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* VENT CORRECTION OK 1. CALL IN T06ME00243 FOR INSPECTION & HAVE APPROVED 2. COMPLETE PIPING TO NEW UNIT ON EXTERIOR GROUND LOCATION & RETEST GAS SYSTEM TO OBTAIN GAS CLEARANCE CARD. |
|
| 05/17/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE FULL SIZE VENT FOR WATER HEATER YOU SHALL NOT REDUCE VENT SIZE AT DRAFT HOOD. 2. PROVIDE BONDING OF BUILDING GAS PIPING. 3. YOU HOT WATER RETURN CHECK VALVE SHOULD BE INSTALLED ON HORIZONTAL PIPING. |
|
| 04/14/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* GAS IS ON AT EXISTING METER 1. PROVIDE MINIMUM 12" COVER ON UNDERGROUND GAS PIPING. 2. PROVIDE CITY APPROVED PLAN OF ADDITION TO GAS PIPING SYSTEM. 3. PROVIDE PERMITS FOR (2) NEW AC/FURNACE UNITS. 4. HAVE NEW WATER HEATER ADDED TO PERMIT AND INSTALLED CORRECTLY. |