Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* 12 PSI 10:49 OK FOR GAS 889-1888 |
|
| 03/15/2006 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 10 PSI 9:54 PRESSURE DROPPING. CHECK FOR LEAKS. RETEST. GALV SHEET METAL SCREWS REQUIRED TO SECURE VENT CONNECTOR. PERMANENTLY CAP 5" VENT OPENING FROM ABANDONED APPLIANCE. PROVIDE APPROVED MATERIALS FOR T&P RELIEF DRAIN PIPING. T&P SHALL GRAVITY DRAIN TO EXTERIOR AND TERMINATE 6" ABOVE GROUND. USE OF APPROVED PIPE PRIMER REQUIRED ON UNDERGROUND JOINTS AND TOOL MARKS BEFORE WRAPPING W/10 MIL TAPE PROVIDE BONDING OF GAS LINE. |