Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06PL00347
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
07/05/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* VALVES AND TEE INSTALLED PER WATER KEYNOTE #11 SITE SEWER IS SHOWN ON REVISED PLAN OF 51806, THIS SITE SEWER WORK IS NOT PART OF THIS PERMIT. PROJECT MAY REQUIRE PDEQ AND ADEQ INCREMENTS PROVIDE APPROVED PLAN WITH PDEQ STRAP. |
|
04/14/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* NOTES FROM 4/12/06 INVALID PIPING AT NORTHEAST BUILDING FOR NEW 6" FIRE RISER IS INSTALLED AND REQUIRES REDLINE AND FUTURE REVISED APPROVED PLAN. NOTE: TUCSON FIRE WILL WANT TO INSPECT THIS AREA. THIS PIPING IS 3' FROM THE CONNECTION AND JUST PAST STREET. PIPING TRAVELS FROM TEE APP. 3' 45 DEGREES DOWN APP. 5' 45 DEGREES HORIZONTAL APP. 10 HEADING WEST, 90 DEG. NORTH TRAVELS 33' NORTH 90 DEG.WEST, 2' WEST 45 DEG. DOWN OFFSET 6' TRAVELDOWN FOR FUTURE SEWER. 18' WEST, 45 DEG. UP AND 45 DEG. HORIZONTAL CAPPED TO CONTINUE JUST OUT OF EXISTING ROADWAY. PROVIDE REDLINE AND REVISED PLAN OF THIS. NOTIFIED GENERAL CONTRACTOR THIS IS ENGINEERED PLAN AND REQUIRES CITY APPROVED REVISION. |
|
04/12/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 6" C-900 AT NORTH END OF BUILDING OFFSET DOWN TO AVOID SEWER PER PLAN AND 45 DEGREE UP JUST PAST STREET AREA TO WEST. |
|
04/06/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* INSTALL OF PIPING PER DELTA 3 SERVING AS REDLINE ON SITE FROM NOTE 3 STATION 3 + 29.69 TO STATION 1 + 65.41 INCLUDING (2) NEW HYDRANTS. 1. NEED PRESSURE TEST PER 2003 TUCSON WATER STATUTES WITH CHLORINIZATION & BACTERIA REPORT PRIOR TO TIE INS. |
|
04/03/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* APPROVED PLAN DATED 2/27/06 RWS ON SITE BUILDING FOR REVISED DELTA 3 SERVING AS REDLINE ON SITE DATED 3/21/06 TO BE APPROVED. 1. PROVIDE CORRECT BUDDING & SHADING OF PIPING. 2. PLEASE CONTACT LORENZO HERNANDEZ AT 791-2665 BEFORE PROCEEDING WITH THIS PROJECT. THIS PROJECT MAY REQUIRE TUCSON WATER INSPECTION. |
|
03/27/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
03/27/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. MET WITH CONTRACTORS FOR PRE-CON MEETING DISCUSSED CITY REQUIREMENTS FOR INSPECTIONS. |