Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2006 | PLUMBING - GAS PRESS TEST FNL | Approved | ||
| 02/27/2006 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PRESSURE TEST REQUIRED USE GAUGE WITH 1/10 PSI INCREMENTATION. WATER HEATER REQUIRES VENT THROUGH ROOF T&P SHALL TERMINATE OUTSIDE, VERTICALLY WITHOUT THREADS AND USE APPROVED MATERIALS. AGA VALVES REQUIRED -- COMPLETE PIPING FOR STOVE GROUND GAS TO WATER LINE (BONDING) |