Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/07/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 10 PSI TEST FROM METER TO WATER HEATER AND ROOFTOP UNIT OK APPROVED - PLUMBER TO MAKE CONNECTION TO METER. INSTALL ITEM 1 & 2 AND THEN ENERGIZE GAS SYSTEM SOAP TESTING ALL FINAL CONNECTIONS. GAS IS NOT PINNED AT METER. |