Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 14 PSI TEST FROM METER P.E. UNDERGROUND UP AT BUILDING OVERHEAD TO FURNACE/WATER HEATER OK GAS CARD AT METER - SW GAS 889-1888 |
|
| 02/23/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PLASTIC PIPING FOR GAS REQUIRES 18" MINIMUM COVER WITH GOOD MATERIAL AS BEDDING AND BACKFILL. 2. PROVIDE TEST GAUGE WITH 1/10 POUND INCREMENTS WITH MINIMUM TEST PRESSURE WITH NO LOSS FOR MINIMUM TIME 3. PROVIDE PLUG IN WATER HEATER PAN 4. PROVIDE NIPPLE IN 125# PRESSURE RELIEF WITH NO THREADED END 5. BONDING WIRE IS TO BE CONNECTE TO BUILDING COLD PIPE NOT FLEX. PETITION OF APPEAL IS ON SITE |