Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 13 PSI TEST IS OK - OK TO BACKFILL CORRECTIONS HAVE BEEN MADE LEFT GAS CARD |
|
| 02/27/2006 | PLUMBING - FINAL | Cancelled | ||
| 02/27/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/22/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE TEST ON GAS SYSTEM IN ENTIRETY 2. INSTALL SCOTCH COAT RISER AT METER 3. PRIME & TAPE ALL TOOL MARKS + FITTINGS ON UNDERGROUND PIPING. 4. PROVIDE TEMPERATURE & PRESSURE RELIEF DEVICE FOR WATER HEATER AND PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATION FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF. 5. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FURNACE AND WATER HEATER VENT PIPING. 6. PROVIDE BONDING OF BUILDING GAS PIPING 7. PROVIDE AGA OR CSA APPROVED GAS VALVE AT APPLIANCES 8. PROVIDE 1" GAS FROM METER TO MEET BTU REQUIREMENTS |