Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/06/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SECURE PIPING BEHIND STOVE 2. T&P PIPING NEEDS TO BE CPVC OR COPPER NOT PVC |
|
| 05/25/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. RELOCATION OF WH REQUIRES A PERMIT. 2. FLUE PIPING EXPOSED TO OUTSIDE SHALL BE TYPE B DOUBLE WALL VENT. 3. VENT SHALL TERMINATE 1' ABOVE SIDE WAY. 4. WATER PIPING SHALL BE INSPECTED WHEN RELOCATING UNIT. 5. WATER PIPING SHALL BE METALLIC WHERE EXPOSED TO OUTDOORS. 6. WH WATER SUPPLY REQUIRES A SHUT OFF VALVE. 7. WH WATER SUPPLY REQUIRES UNIONS. 8. PIPING SUBJECT TO FREEZE DAMAGE SHALL BE INSULATED. 9. ELECTRICAL BONDING OF GAS PIPING IS REQUIRED. |
|
| 05/03/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - 3/4 GAS YARD PIPING IS OK TO COVER. - PRESSURE TEST IS OK. - SECURE PIPING BEHIND STOVE. - WATER HEATER MUST BE INSTALLED BEFORE GAS FINAL CAN BE APPROVED. |