Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: SITE - SEWER
Permit Number - T06PL00290
Inspection Description - SITE - SEWER
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" HCS FROM MANHOLE #3 TO CLEANOUT AIRTEST OK WAITING ON AUTHORIZATION TO DISCHARGE FROM P.C.D.E.Q |
|
08/04/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 4" FROM MANHOLE #6 TO CLEANOUT K AIR TEST OK 4" FROM MANHOLE #1 TO CLEANOUT B AIR TEST OK 4" FROM EXISTING MANHOLE 6722.02 TO CLEANOUT C AIR TEST OK |
|
07/21/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* EXISTING MANHOLE 6722-02 TO MANHOLE #1 AIRTEST OK RETEST OF MANHOLE #2 TO #3 AIR TEST OK MANHOLE #4 TO CLEANOUT F AIR TEST OK |
|
07/14/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* RETEST VACUUM TEST MANHOLE #6 OK RETEST VACUUM TEST MANHOLE #4 OK VACUUM TEST MANHOLE #2 OK PRESSURE TEST 8" SDR FROM MANHOLE #5 TO #6 OK PRESSURE TEST 8" SDR FROM MANHOLE #4 TO #5 OK 1. NEED TEST ON 6" OUT OF MANHOLE #4 PRESSURE TEST 8" SDR FROM MANHOLE #3 TO #4 OK 1. NEED TEST ON 6" OUT OF MANHOLE #3 PRESSURE TEST ON 8" SDR FROM MANHOLE #2 TO #3 NOT READY. |
|
06/29/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) MANHOLE #1 VACUUM TEST-OK 2) MANHOLE #6 VACUUM TEST-DENIED 3) MANHOLE #5 VACUUM TEST-OK 4) MANHOLE #4 VACUUM TEST-DENIED 5) REINSPECTION OF DENIED TESTS REQUIRED |
|
04/12/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 4" FROM MANHOLE #6722.02 THRU CLEANOUT C FOR FUTURE BEDDING, SHADING, TRACER OK 1. PROVIDE PERM CAP OR LONG RADIUS FITTING AT END OF LINE ON THIS 4". |
|
04/11/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 4" HCS LATERAL TO CLEANOUT D, 4" HCS LATERAL TO CLEANOUT G 4" HCS LATERAL TO CLEANOUT H 4" HCS DIP LATERAL TO CLEANOUT I 4" HCS LATERAL DIP TO CLEANOUT J BEDDING, SHADING, LAYING TRACERS OK |
|
04/07/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR CONTINUOUS TO MANHOLE #6 4" HCS LATERAL FROM MANHOLE #6 TO CLEANOUT K. 6" DIP FROM MANHOLE #3 TO CLEANOUT F 6" DIP FROM MANHOLE #4 TO CLEANOUT E BEDDING, SHADING, LAYING OK MANHOLE BASE #1, 2, 3 OK |
|
04/04/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR 35 CONTINUES EAST FROM MANHOLE #5 TO APP. 30' WEST OF MANHOLE #6 INCLUDING HCS WYE AT STATION 1639.45 4" BEDDING, SHADING, LAYING OK |
|
03/30/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR 35 CONTINUES EAST TO MANHOLE #3 THRU TO THE CONTINUES THRU TO MANHOLE #5 INCLUDING (2) HCS WYES FOR STA 1505.30 AND 1534.76 BEDDING, SHADING, LAYING OK |
|
03/29/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR FROM PUBLIC MANHOLE #2 AREA EAST TO PRIVATE MANHOLE #3 INCLUDING WYE BRANCH AT STATION 10-46.30 BEDDING, SHADOWS, LAYING OK |
|
03/27/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* EXISTING MANHOLE 6722-02 TO MANHOLE #1 8" SDR 35 OK 1. WILL NEED PRESSURE AIR TEST ON PIPING, VACUUM TEST ON MANHOLES, VERIFICATION OF GRADE AT LATER DATE. 4" SDR 35 FROM MANHOLE 1 TO NORTH, TO STUB UP AT PAD 1 SAME NOTES. |
|
03/24/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 500' SEWER ALREADY RAN AND BEING COVERED. |
|
03/23/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BEDDING IN PLACE FOR PIPING, RICK ENGINEERING TO BE ADEQ INSPECTOR. OK TO START PIPE INSTALL. |