Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2006 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 02/01/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI PRESSURE TEST REQUIRED ON ENTIRE GAS SYSTEM-GAGE SHALL HAVE 1/10 PSI INCREMENTATION 2) ALL GAS APPLIANCES MEET CODES 3) AGA VALVES REQUIRED, NEW FLEXES REQUIRED 4) PROPER MATERIALS REQUIRED FOR T & P 5) T & P REQUIRED TO BE OPERATIONAL 6) WATER HEATER SHALL REST ON AN APPROVED BASE OF CONCRETE OR MATERIALS DESIGNED FOR USE AND MUST BE 3" ABOVE DIRT 7) 1" CLEARANCE REQUIRED FROM FLUE VENT AND COMBUSTIBLES 8) SECURE VENT WITH SCREWS 9) ELECTRICAL BONDING REQUIRED |