Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL00190

Parcel: 120020900


Addresses:

3908 S 15TH AV

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
02/10/2006 PLUMBING - GAS PRESSURE TEST Approved
02/01/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) 10 PSI PRESSURE TEST REQUIRED ON ENTIRE GAS SYSTEM-GAGE SHALL HAVE 1/10 PSI INCREMENTATION
2) ALL GAS APPLIANCES MEET CODES
3) AGA VALVES REQUIRED, NEW FLEXES REQUIRED
4) PROPER MATERIALS REQUIRED FOR T & P
5) T & P REQUIRED TO BE OPERATIONAL
6) WATER HEATER SHALL REST ON AN APPROVED BASE OF CONCRETE OR MATERIALS DESIGNED FOR USE AND MUST BE 3" ABOVE DIRT
7) 1" CLEARANCE REQUIRED FROM FLUE VENT AND COMBUSTIBLES
8) SECURE VENT WITH SCREWS
9) ELECTRICAL BONDING REQUIRED