Permit: T06PL00180

Parcel: 135042390

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
02/17/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
11 PSI TEST IS OK
LEFT GAS CARD
OK TO BACKFILL
02/06/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE APPROVED SCOTCH COATED OR P.E. PIPING MATERIAL FOR UNDERGROUND INSTALLATION.
2. PROVIDE CORRECT VENTING FOR WATER HEATER & FURNACE IT SHALL BE APPROVED MATERIAL FLOWING IN AN UPWARD DIRECTION AT LEAST 1/4" PER FOOT TO TERMINATION ON ROOF WITH APPROVED JOINT CAP. PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT CONNECTIONS.
3. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL BE MADE UP CORRECTLY SEPARATE FROM CONDENSATE DRAIN PIPING GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATIN FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF.
4. PROVIDE APPROVED COUPLINGS ON PIPING AT WATER HEATER & FURNACE
5. PROVIDE BONDING OF BUILDING GAS PIPING.
6. CORRECT PIPING TO WATER HEATER
7. IF FLUE VENT PIPING TERMINATES WITHIN 10' OF COOLER INTAKE IT SHALL BE 3' ABOVE TOP OF COOLER.