Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE LEFT GAS CARD |
|
| 03/13/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SECURE GAS PIPING & PLUG DRAIN PAN FOR WATER HEATER |
|
| 03/10/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* RELOCATE HIGH COMBUSTION AIR OPENING. PROVIDE MAX. 3' FLEX CONNECTORS ON APPLIANCES 15 PSI TEST IS OK OK TO BACKFILL TRENCH |
|
| 02/14/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. HAVE NEW WATER HEATER ADDED TO PERMIT. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL GRAVITY DRAIN TO DAYLIGHT OR OBTAIN SIGNED PETITION OF APPEAL FOR ALTERNATE FORM OF T&P RELIEF ON SITE WITH CORRECT INSTALLATION. 3. GAS PIPING SHALL NOT BE INSTALLED UNDER BUILDING OR STRUCTUE UNLESS INSTALLED IN CORRECT SLOOVING PER CHAPTER 12 2003 UPC. 4. PROVIDE MINIMUM 100 SQ INCH UPPER & LOWER COMBUSTION AIR FOR WATER HEATER. 5. PROVIDE CORRECT BONDING OF BUILDING GAS PIPING. 6. VENTS FROM WATER HEATER & FURNACE SHALL HAVE 3 GALV SCREWS AT EACH JOINT. 7. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION AT FURNACE & WATER HEATER. 8. VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE 9. CHECK YOUR BTU REQUIREMENTS OF APPLIANCES AND VERIFY YOUR PIPE SIZING MEETS THIS REQUIREMENT. |