Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/18/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*NO GAS PIPING SHALL BE UNDEGROUND UNDER STRUCTURE UNDERGROUND PIPING TO BE SCOTCH COAT INCLUDING RISERS, WITH PRIMER THEN 10 MIL TAPE AT ALL JOINTS & TOL M?? GAS PIPING SYSTEM TO BE TESTED IN ITS ENTIRETY SECURE GAS PIPING AT WATER HEATER & PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVE. VENT FROM WATER HEATER TO HAVE 1" MINIMUM CLEARANCE FROM PLYWOOD OF ROOF STRUCTURE AND HAVE 3 GALV SCREWS AT EACH JOINT OF VENT PIPING PROVIDE AGA OR CSA APPROVED GAS VALVE AT FURNACE PROVIDE BONDING OF BUILDING GAS PIPING |