Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/23/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 22PSI 60 PSI GAUGE OK TO COVER PIPING T&P SHALL TERMINATE OUTSIDE, VERTICALLY AT 6" ABV GROUND SECURE VENT CONNECTOR AT EACH JOINT W/SHEET METAL SCREWS PROVIDE A 10"X10" COMBUSTION AIR OPENING AT FURNACE SINGLE WALL FLUE PIPING AT FURNACE MUST NOT INCREASE SIZE THEN REDUCE IN SIZE, SIZING TO BE CONSISTENT PROVIDE ELECTRICAL BONDING |