Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/13/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/19/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* RE-ROUTE GAS PIPING LOCATED UNDER BUILDING. INCREASE SIZE TO MEET MINIMUM SIZING REQUIREMENTS OF UPC TERMINATE T&P RELIEF DRAIN 6" TO 24" ABOVE GROUND PROVIDE 1" CLEARANCE BETWEEN FLUE PIPE AND COMBUSTIBLE MATERIALS PROVIDE AGA VALVES PROVIDE BONDING WRAP TOTAL MARKS ON SCOTCH KOTE PIPING PROVIDE PRESSURE TEST |
|
| 01/17/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE ACCESS TO HOME FOR GAS INSPECTION PROVIDE PRESSURE TEST OF GAS SYSTEM PROVIDE 12" COVER ABOVE YARD PIPING. |